Customer: Sahaviriya Steel Industries Public Company Limited
Description: Disassemble the wobble assembly to inspect the tie rod diameter. Manufacture new tie rod and nut parts to replace the original components. Assemble 24 sets of tie rods into the wobble unit, aligning with the bolt holes on both the wobble and rotor coupling. Perform machining on the wobble holes to ensure proper alignment with the coupling.
1.Remove the old tie rod from the bottom wobble.
2. Replace the bottom wobble with a new unit and reassemble it into its original position.
3.Inspect the tie rod holes of both the old and new wobble units to allow MC to adjust the parameters accordingly.
4.MC Mobile must ensure that the tie rod holes of both the new and old wobble units are aligned at the center on both sides.
5.MC Mobile must ensure that the tie rod holes of both the new and old wobble units are precisely aligned at the center on both sides.
6.Assemble the old and new wobble units together after MC has completed the process.
7.Assemble the tie rod between the new and old wobble units using liquid nitrogen.
8.Assembly completed and ready for rotation testing.
✉️